TPM – TOTAL PRODUCTIVE MAINTENANCE / EXCELLENCE IN INDUSTRIAL PRODUCTION MAINTENANCE

19/09/2021 NOVART Case Alcon (PHAMACEUTICALS)
In the first cycle (2015) we obtained 31% productivity gains in the packing process (Joint Production and Industrial Maintenance Action).
In the second cycle (2016), we focused on the increase in productivity resulting from balancing the packing process production, when we achieved 25% gains.
Methodology tailored to the client’s needs; lectures and training sessions supported all of the work, always with the SETA WAY of transferring knowledge.
Share This: